This extreme pour in Nebraska was accomplished with MAKO Screed Supports and the Lura Lightning Strike Roller Screed.
The 58 ft (17.7 m) diameter grain silo base with a 38 degree sloping, cone-shaped base was 34 ft (10 m) from bottom to the top of the base. A screed pipe supported by MAKO FinCaps was placed at the midway point. The concrete was placed using the Lura Lightning Strike roller screed.